Kitchen Corner Subsidence Remediation
A plumbing leak under a Forestville unit softened the soil beneath the kitchen slab, causing rapid subsidence and step cracking. Targeted resin injection lifted the slab back to its original level and stabilised the ground in just a few days, without demolition or rebuild works.
Heritage Stone Building Structural Realignment – Late 1800s Wedding Venue
Severe wall rotation – up to 310mm separation – in a late 1800s heritage-listed stone building at The Brae, Dawesley. Urathane Solutions used resin injection, an injected pier system and push/pull propping to realign the structure in 5 days, restoring it for use as a wedding venue.
Childcare Centre Subsidence Stabilisation
A Blakeview childcare centre was experiencing 100mm+ of subsidence within four years of construction. Urathane Solutions worked with the engineer on a staged injected pier solution – 12 piers and 54 injection points – completed within a fortnight while the centre kept operating.
Heritage Stone Footing Stabilisation & Structural Realignment – Early 1900s Property
Early 1900s solid masonry building experiencing severe structural deterioration due to prolonged neglect as a commercial office. Urathane Solutions delivered full-perimeter ground stabilisation, structural realignment, and controlled rotation recovery using resin injection and engineered propping systems.
Bunnings Truck Loading Dock Stabilisation
This project involved a driveway slab servicing a high-traffic truck loading dock. The slab had settled due to unengineered fill and inadequate compaction, compounded by constant heavy vehicle loading.
Urathane Solutions works enabled Bunnings to return the loading dock to full operations with just one day downtime, all while preventing much more expensive structural reworks.
Major Slab Subsidence Remediation
Subsidence damage repair works enabled the property to regain a level of structural normality, transforming what was initially deemed a total loss into a stabilised and recoverable asset.